Calendar e2e still expects a Week link on production #1504

Open
opened 2026-10-09 06:47:20 +00:00 by kayg · 0 comments
Owner

Merge round #1500 ran bun e2e/calendar.mjs against the merged head and production 9dc65437e with its matching web assets.

Both fail waiting30s for getByRole('link', { name: 'Week', exact: true }). Merged total49.825s; production39.105s. The fixture still expects an older view control role. The test expectation is unchanged.

Update the Calendar suite to use the current view control contract after owner review. Separate production-build Week screenshots and the bounded Calendar range probe cover the merge's changed view.

Merge round #1500 ran `bun e2e/calendar.mjs` against the merged head and production 9dc65437e with its matching web assets. Both fail waiting30s for `getByRole('link', { name: 'Week', exact: true })`. Merged total49.825s; production39.105s. The fixture still expects an older view control role. The test expectation is unchanged. Update the Calendar suite to use the current view control contract after owner review. Separate production-build Week screenshots and the bounded Calendar range probe cover the merge's changed view.
Commenting is not possible because the repository is archived.
No labels
No milestone
No project
No assignees
1 participant
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
kayg/calternal-v0#1504
No description provided.