Money combined e2e uses an obsolete production import button label #1556

Open
opened 2026-10-10 18:24:25 +00:00 by kayg · 0 comments
Owner

The unchanged combined Money e2e script stops at its import confirmation selector on production ac7fda1a8 and on merge38. Both runs pass the prior real Budget/Category/Account/assignment/transaction flow and verify exact persisted Markdown and derived numbers.

apps/web/e2e/money.mjs:746 waits for a button named Create Budget; the production wizard now exposes Import budget. Both logs contain PASS the User flow wrote exact Markdown and the screens show the derived numbers, then the same missing-button timeout.

No existing test expectation was changed in #1554. The separate, unchanged money-wizard-1140.mjs --formats-only suite passes on both builds: paired CSV, JSON, replacement confirmation, Undo after server restart, and unrelated ZIP failure. Update the old selector in its own reviewed change; review its remaining selectors too. This pre-existing test failure does not block merge38 under #1554.

The unchanged combined Money e2e script stops at its import confirmation selector on production ac7fda1a8 and on merge38. Both runs pass the prior real Budget/Category/Account/assignment/transaction flow and verify exact persisted Markdown and derived numbers. `apps/web/e2e/money.mjs:746` waits for a button named `Create Budget`; the production wizard now exposes `Import budget`. Both logs contain `PASS the User flow wrote exact Markdown and the screens show the derived numbers`, then the same missing-button timeout. No existing test expectation was changed in #1554. The separate, unchanged `money-wizard-1140.mjs --formats-only` suite passes on both builds: paired CSV, JSON, replacement confirmation, Undo after server restart, and unrelated ZIP failure. Update the old selector in its own reviewed change; review its remaining selectors too. This pre-existing test failure does not block merge38 under #1554.
Commenting is not possible because the repository is archived.
No labels
No milestone
No project
No assignees
1 participant
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
kayg/calternal-v0#1556