Plan: make the canvas real, in parallel lanes, with add-host #109

Open
opened 2026-10-08 13:28:28 +00:00 by kayg · 0 comments
Owner

Owner (2026-10-08): make the canvas real and parallelise it with add-host for a usable product and a presentable demo (zooming between views and the Mesh view are the wow).

Lanes:

  • UI-0, canvas-product (Sonnet, running): merge demo-preview and proto-clusters, move the canvas into product modules (camera, layout, views, windows, backdrop, model, sessions, toolbar, mesh) with adapter interfaces, then the Console view on real sessions in production.
  • After UI-0 step 1, in parallel: UI-1 windows on real sessions with stream visibility (needs #107); UI-2 the Mesh view on the real API (#108); UI-3 add-host on real provisioning (#87, #78); UI-4 canvas sync client (#98); UI-5 toolbar and session manager on real sessions (#99, #100).
  • Backend (Codex): #107 canvas streams and #108 Mesh API launched; #98, #99, #100, #87, #78 running. Updates (#102), backups (#105) and relay (#103) are deferred behind these.
  • Design keeps iterating in the mockup branches; approved changes flow into canvas-product.
Owner (2026-10-08): make the canvas real and parallelise it with add-host for a usable product and a presentable demo (zooming between views and the Mesh view are the wow). Lanes: - **UI-0, canvas-product (Sonnet, running):** merge demo-preview and proto-clusters, move the canvas into product modules (camera, layout, views, windows, backdrop, model, sessions, toolbar, mesh) with adapter interfaces, then the Console view on real sessions in production. - **After UI-0 step 1, in parallel:** UI-1 windows on real sessions with stream visibility (needs #107); UI-2 the Mesh view on the real API (#108); UI-3 add-host on real provisioning (#87, #78); UI-4 canvas sync client (#98); UI-5 toolbar and session manager on real sessions (#99, #100). - **Backend (Codex):** #107 canvas streams and #108 Mesh API launched; #98, #99, #100, #87, #78 running. Updates (#102), backups (#105) and relay (#103) are deferred behind these. - **Design keeps iterating** in the mockup branches; approved changes flow into canvas-product.
Sign in to join this conversation.
No labels
launch-qa
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
kayg/infraternal#109
No description provided.